[{"data":1,"prerenderedAt":229},["ShallowReactive",2],{"page-\u002F":3,"projects-all-6-":80},{"id":4,"title":5,"body":6,"category":71,"description":72,"extension":73,"image":71,"images":71,"location":71,"meta":74,"navigation":75,"path":76,"robots":71,"seo":77,"slug":71,"stem":78,"year":71,"__hash__":79},"content\u002Findex.md","Dakdekker in Eindhoven en Helmond | Meijer Dak & Gevel",{"type":7,"value":8,"toc":67},"minimark",[9,16,19,22,43,50,53,58,64],[10,11],"hero-section",{"poster":12,"subtitle":13,"title":14,"video":15},"\u002Fvideo\u002Fhero-poster.webp","Dakwerken en gevelrenovatie in Eindhoven, Helmond en de dorpen daartussen. Een vaste ploeg, nette afwerking, en een dak of gevel die er weer jaren tegen kan.","Sterk in dak, strak in gevels","\u002Fvideo\u002Fhero.mp4",[17,18],"stats-bar",{},[20,21],"service-cards",{},[23,24,29,33,36],"text-image",{"alt":25,"eyebrow":26,"image":27,"title":28},"Metselwerk in uitvoering langs een lange gevel","Over ons","\u002Fimages\u002Fhome\u002Fover-ons.webp","Klein bedrijf, groot vakgebied",[30,31,32],"p",{},"Meijer Dak & Gevel is een compacte ploeg die zowel het dak als de gevel voor zijn rekening neemt. Dat scheelt u een aannemer: het lood bij de schoorsteen, het voegwerk eronder en de pannen ernaast worden door dezelfde mensen gedaan, in één keer goed.",[30,34,35],{},"We werken voor particuliere woningen en voor bedrijfspanden, van een enkele scheur in het metselwerk tot een dak dat compleet van de latten af gaat.",[30,37,38],{},[39,40,42],"a",{"href":41},"\u002Fover-ons","Lees meer over ons",[44,45],"project-grid",{":limit":46,"eyebrow":47,"ground":48,"title":49},"6","Recent werk","alt","Wat we hebben opgeleverd",[51,52],"why-us",{},[54,55],"faq-section",{":items":56,"eyebrow":57},"[{\"q\":\"Hoe lang gaat een pannendak mee?\",\"a\":{\"Keramische dakpannen zelf gaan makkelijk vijftig tot honderd jaar mee\":{\" Wat eerder opraakt is alles eromheen\":\"het panlatwerk, de folie eronder, en het lood bij schoorsteen en kilgoot. Bij een dak van veertig jaar of ouder is het meestal niet de pan die stuk is, maar de onderconstructie.\"}}},{\"q\":\"Hoe lang gaat een bitumen dak mee?\",\"a\":\"Een goed aangebrachte bitumen dakbedekking gaat twintig tot dertig jaar mee. Wat de levensduur bepaalt is zelden het vlak zelf maar de randen — de opstanden, de doorvoeren en de aansluiting op de dakrand. Daar begint bijna elke lekkage.\"},{\"q\":\"Waarom gaat voegwerk kapot?\",\"a\":\"Voegwerk is zachter dan de steen, en dat is de bedoeling — het vangt beweging en vocht op in plaats van de baksteen. Na verloop van tijd spoelt de voeg uit door regen en vorst. Als u met een sleutel de voeg makkelijk weg kunt krabben, is het tijd. Wachten betekent dat het vocht de steen zelf bereikt, en dan wordt het duurder.\"},{\"q\":\"Wat is een sedumdak en wanneer kan dat?\",\"a\":\"Een sedumdak is een laag vetplanten op een plat of licht hellend dak. Het houdt regenwater vast, isoleert mee en gaat langer mee dan een kale dakbedekking omdat de UV-belasting eraf is. Voorwaarde is dat de constructie het extra gewicht draagt; dat controleren we vooraf.\"},{\"q\":\"Werken jullie ook aan bedrijfspanden?\",\"a\":\"Ja. Platte daken op bedrijfspanden zijn een groot deel van het werk — bitumen, inclusief het zinkwerk, de randafwerking en de doorvoeren.\"}]","Goed om te weten",[59,60],"werkgebied-list",{"eyebrow":61,"ground":62,"title":63},"Werkgebied","surface","Waar we werken",[65,66],"cta-band",{},{"title":68,"searchDepth":69,"depth":69,"links":70},"",2,[],null,"Dakwerken en gevelrenovatie in Eindhoven, Helmond en omgeving. Bitumen, sedum en pannendaken, metselwerk, voegwerk en schoorsteenrenovatie.","md",{},true,"\u002F",{"title":5,"description":72},"index","L8cTY5QfVEdCMyb9GN6M_zDyle3s8ZR3Smhad7S5B_I",[81,103,123,155,179,204],{"id":82,"title":83,"body":84,"category":94,"description":95,"extension":73,"image":96,"images":71,"location":71,"meta":97,"navigation":75,"path":98,"robots":71,"seo":99,"slug":71,"stem":100,"year":101,"__hash__":102},"content\u002Fprojecten\u002Fdakraam-pannendak.md","Dakraam geplaatst in bestaand pannendak",{"type":7,"value":85,"toc":92},[86,89],[30,87,88],{},"In een bestaand pannendak is een dakraam ingebouwd. De pannen rondom zijn op maat gesneden, het raam is met nieuwe gootstukken en aansluitend metaalwerk in het vlak gezet.",[30,90,91],{},"Het snijwerk rondom een dakraam bepaalt of het er over tien jaar nog droog onder is. Te ruim gesneden en het water vindt zijn weg; te krap en de pan komt onder spanning te liggen.",{"title":68,"searchDepth":69,"depth":69,"links":93},[],"dakwerken","Een dakraam ingebouwd in een bestaand pannendak, met nieuwe gootstukken en aansluitend loodwerk.","\u002Fimages\u002Fprojecten\u002Fdakraam-pannendak.webp",{},"\u002Fprojecten\u002Fdakraam-pannendak",{"title":83,"description":95},"projecten\u002Fdakraam-pannendak",2026,"UuCj9raS7Kdp0ukkLZLyzY6TTifP1WXc1SFQVOcgwb8",{"id":104,"title":105,"body":106,"category":94,"description":116,"extension":73,"image":117,"images":71,"location":71,"meta":118,"navigation":75,"path":119,"robots":71,"seo":120,"slug":71,"stem":121,"year":101,"__hash__":122},"content\u002Fprojecten\u002Fdakrenovatie-isolatie.md","Dak tot op de latten vernieuwd",{"type":7,"value":107,"toc":114},[108,111],[30,109,110],{},"Het dak is gestript tot op de constructie. Daarna zijn isolatieplaten aangebracht, is er nieuw tengel- en panlatwerk overheen gegaan en zijn de nieuwe pannen per pak op het vlak verdeeld om ze vandaaruit te leggen.",[30,112,113],{},"Een dakvervanging is het moment om de isolatie mee te nemen: de pannen liggen er toch af, en achteraf isoleren kost een tweede keer stellingwerk.",{"title":68,"searchDepth":69,"depth":69,"links":115},[],"Een hellend dak gestript tot de constructie, voorzien van nieuwe isolatie en panlatten, en opnieuw gedekt.","\u002Fimages\u002Fprojecten\u002Fdakrenovatie-isolatie.webp",{},"\u002Fprojecten\u002Fdakrenovatie-isolatie",{"title":105,"description":116},"projecten\u002Fdakrenovatie-isolatie","rn6OzQ5ZDz6RIWpRTZLHKhWpOwoxwtAdmBY6Rv8AnEE",{"id":124,"title":125,"body":126,"category":136,"description":137,"extension":73,"image":138,"images":139,"location":149,"meta":150,"navigation":75,"path":151,"robots":71,"seo":152,"slug":71,"stem":153,"year":101,"__hash__":154},"content\u002Fprojecten\u002Fgevelrenovatie-eindhoven.md","Gevelrenovatie woonhuis in Eindhoven",{"type":7,"value":127,"toc":134},[128,131],[30,129,130],{},"Een vrijstaand woonhuis dat over de volle hoogte in de steiger is gezet. De gevel is aangepakt tot en met de dakrand, waarna de steiger eraf kon en het pand er weer strak bij stond.",[30,132,133],{},"Werken vanaf een steiger rondom betekent dat het hele vlak in één keer wordt gedaan, in plaats van in stukken. Dat scheelt in het eindresultaat: geen zichtbare overgangen tussen wat vandaag en wat volgende maand is gedaan.",{"title":68,"searchDepth":69,"depth":69,"links":135},[],"gevelrenovatie","Complete gevelrenovatie van een vrijstaand woonhuis in Eindhoven, uitgevoerd vanaf een steiger rondom.","\u002Fimages\u002Fprojecten\u002Fgevelrenovatie-eindhoven.webp",[140,143,146],{"src":141,"alt":142},"\u002Fimages\u002Fprojecten\u002Fgevelrenovatie-eindhoven-2.webp","De woning in de steiger tijdens de uitvoering",{"src":144,"alt":145},"\u002Fimages\u002Fprojecten\u002Fgevelrenovatie-eindhoven-3.webp","De steiger vanaf de zijkant, over de volle hoogte van de gevel",{"src":147,"alt":148},"\u002Fimages\u002Fprojecten\u002Fgevelrenovatie-eindhoven-4.webp","Detail van het metselwerk na afronding","Eindhoven",{},"\u002Fprojecten\u002Fgevelrenovatie-eindhoven",{"title":125,"description":137},"projecten\u002Fgevelrenovatie-eindhoven","G8NXbhQamYFDDEv2A7LyMldpV08-gqJwG1HgRk0BNrw",{"id":156,"title":157,"body":158,"category":94,"description":168,"extension":73,"image":169,"images":170,"location":71,"meta":174,"navigation":75,"path":175,"robots":71,"seo":176,"slug":71,"stem":177,"year":101,"__hash__":178},"content\u002Fprojecten\u002Fnieuw-pannendak.md","Nieuw pannendak met zinken goot",{"type":7,"value":159,"toc":166},[160,163],[30,161,162],{},"Nieuwe grijze pannen over het volle dakvlak, met de nokvorsten strak in lijn en een nieuwe zinken goot langs de dakrand, inclusief de uitloop naar de regenpijp.",[30,164,165],{},"Goot en dakbedekking horen bij elkaar. Nieuwe pannen op een oude, doorgeroeste goot leggen betekent dat het water alsnog op de verkeerde plek terechtkomt.",{"title":68,"searchDepth":69,"depth":69,"links":167},[],"Een compleet nieuw grijs pannendak met nieuwe zinken mastgoot en hemelwaterafvoer.","\u002Fimages\u002Fprojecten\u002Fnieuw-pannendak.webp",[171],{"src":172,"alt":173},"\u002Fimages\u002Fprojecten\u002Fnieuw-pannendak-2.webp","De nieuwe zinken goot met uitloop naar de regenpijp",{},"\u002Fprojecten\u002Fnieuw-pannendak",{"title":157,"description":168},"projecten\u002Fnieuw-pannendak","-4Y6CyBtHxzkNnWVemmc8-u-ex3kOYRXKnUEwc4VS6s",{"id":180,"title":181,"body":182,"category":136,"description":192,"extension":73,"image":193,"images":194,"location":71,"meta":198,"navigation":75,"path":199,"robots":71,"seo":200,"slug":71,"stem":201,"year":202,"__hash__":203},"content\u002Fprojecten\u002Fmetsel-en-voegwerk.md","Metsel- en voegwerk over de volle gevel",{"type":7,"value":183,"toc":190},[184,187],[30,185,186],{},"Een lange, doorlopende gevel opnieuw opgemetseld en gevoegd. Het werk loopt over de volle lengte door, met onderaan een strakke aansluiting op de donkere plint.",[30,188,189],{},"Bij een gevel van deze lengte valt elke onderbreking in het voegwerk op. Daarom wordt er in banen doorgewerkt en niet per dagdeel gestopt waar het toevallig uitkomt.",{"title":68,"searchDepth":69,"depth":69,"links":191},[],"Een lange gevel opnieuw opgemetseld en gevoegd, met een strakke aansluiting op de zinken plint.","\u002Fimages\u002Fprojecten\u002Fmetsel-en-voegwerk.webp",[195],{"src":196,"alt":197},"\u002Fimages\u002Fprojecten\u002Fmetsel-en-voegwerk-2.webp","Metselwerk in uitvoering langs de gevel",{},"\u002Fprojecten\u002Fmetsel-en-voegwerk",{"title":181,"description":192},"projecten\u002Fmetsel-en-voegwerk",2025,"j6hrrLIul_AaoL5afnVBUlk-VaMUPEFOJ4OUGHHqJSE",{"id":205,"title":206,"body":207,"category":94,"description":217,"extension":73,"image":218,"images":219,"location":71,"meta":223,"navigation":75,"path":224,"robots":71,"seo":225,"slug":71,"stem":226,"year":227,"__hash__":228},"content\u002Fprojecten\u002Fschoorsteen-herstel.md","Schoorsteen hersteld en ingelood",{"type":7,"value":208,"toc":215},[209,212],[30,210,211],{},"De schoorsteen is hersteld en aan de bovenzijde opnieuw dicht gezet, met nieuw lood op de aansluiting met het dakvlak en een nieuwe doorvoer door de kop.",[30,213,214],{},"Een schoorsteen die van onderen nog goed is, hoeft niet altijd gesloopt te worden. Vaak zit het probleem in de afdekking en het lood — en dat is een aanzienlijk kleinere ingreep.",{"title":68,"searchDepth":69,"depth":69,"links":216},[],"Een gestucte schoorsteen hersteld, opnieuw ingelood en voorzien van een nieuwe doorvoer.","\u002Fimages\u002Fprojecten\u002Fschoorsteen-herstel.webp",[220],{"src":221,"alt":222},"\u002Fimages\u002Fprojecten\u002Fschoorsteen-herstel-2.webp","De schoorsteenkop met nieuwe afdekking en doorvoer",{},"\u002Fprojecten\u002Fschoorsteen-herstel",{"title":206,"description":217},"projecten\u002Fschoorsteen-herstel",2024,"1x2kaOYmnqPRSHvqK2qcfK51JpTgQpYz1OMYXBT5u88",1786711007602]